Daily Knock #15: The mains and the hoist

The log · set at Nirmal Steel Works · played 10 November 2026

Four entries were made in the works log on the night of the power cut. Three are true. One cannot be. Which?

  1. A22:50The fitter runs the overhead hoist to lift a ladle.
  2. B23:15The hoist starts up again after the cut.
  3. C23:40The foreman reads the furnace gauge.
  4. D23:55The time clock stamps the fitter out at the gate lodge.fixed

What we know

  • the gate lodge to the furnace bay: 6 minutes on foot.
  • the furnace bay to the hoist gantry: 3 minutes on foot.
  • the gate lodge to the hoist gantry: 9 minutes on foot.
  • The mains failed at 22:42 and came back at 23:10. The overhead hoist runs on the mains.
  • A line marked fixed comes from a signed or machine-stamped record, and is right.
Stuck? A hint

Check which lines need the mains. Then check the times against the cut.

Show the answer

Answer. Line A (22:50): The fitter runs the overhead hoist to lift a ladle.

The hoist runs on the mains, and the mains were off from 22:42 to 23:10, so the fitter cannot have run it at 22:50. It starting again at 23:15 is after the power came back.

Play the full case Today’s Daily Knock

Updated .